사출 성형기Arburg
320C 500-170 mit Integralpicker-255745
사출 성형기
Arburg
320C 500-170 mit Integralpicker-255745
제조 연도
2020
상태
중고
위치
Bad Berleburg 

사진은 보여줍니다
지도 표시
가격 및 위치
- 위치:
- Zum Heilbach 15, 57319 Bad Berleburg, Deutschland

전화하기
제안 세부 정보
- 광고 ID:
- A21201940
- 업데이트:
- 마지막 업데이트: 10.02.2026
설명
1x Arburg 320C 500-170 Golden Edition with Integralpicker
Year of manufacture: 11/2020
Operating hours: 4,800
A total of 3 machines available!
1x Year: 2020
2x Year: 2022
Equipment:
CG series
320 C 500 - 170
Thermoplastic cylinder complete, 35 mm, wear-resistant
Standard screw coupling, two-flat coupling geometry
Selogica direct control system
Hydraulic system with 2 variable displacement pumps
Anniversary model GOLDEN EDITION
Thermoplastic processing
Open nozzle 35 mm
Nozzle tip for open nozzle
Heating band for open nozzle
Clamping platen set 320 central Ø 125 mm
Electrical connection for blow-off device 1 on machine frame
Selector unit, longitudinal installation including connection
Programmable conveyor belt in machine frame, longitudinal
Preparation for INTEGRALPICKER V
Robot system interface (according to EUROMAP 67), 50-pin
Basic Connectivity for additional "Connected Services"
Printer interface, serial USB
CompactFlash interface for data storage
Dsdpfxoyibayo Aa Seun
Operation authorization with chip card according to EUROMAP 65
Parallel connection for heating band nozzle tip or adapter
Freely configurable page for "start-up parameters"
Color dosing unit interface
Shut-off valve for cooling water inlet
Cooling water filter 100 µm included
3 manual-adjustable free cooling circuits
GOLDEN Automation Package with IP-V
Regulated machine cooling circuits
aXw Control Setup Bundle
aXw Control Start-Stop Bundle
ARBURG Remote Service (ARS)
Productivity package
Initial commissioning by ARBURG service
Instruction and training on the machine at customer's site
CD operating manual and spare parts list
Label language German (DE)
Without granulate container 50 L
Without heating band for nozzle tip
Flexible machine mounting on anti-vibration elements
Connection for ejector plate safety
Quick-release coupling for ejector
Water-cooled control cabinet
Socket distributor: 1 CEE, 1 Schuko
Hydraulic ejector
Safety guard open at the top
Standard equipment packages
Machine equipped with INTEGRALPICKER
New ARBURG color scheme
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
Year of manufacture: 11/2020
Operating hours: 4,800
A total of 3 machines available!
1x Year: 2020
2x Year: 2022
Equipment:
CG series
320 C 500 - 170
Thermoplastic cylinder complete, 35 mm, wear-resistant
Standard screw coupling, two-flat coupling geometry
Selogica direct control system
Hydraulic system with 2 variable displacement pumps
Anniversary model GOLDEN EDITION
Thermoplastic processing
Open nozzle 35 mm
Nozzle tip for open nozzle
Heating band for open nozzle
Clamping platen set 320 central Ø 125 mm
Electrical connection for blow-off device 1 on machine frame
Selector unit, longitudinal installation including connection
Programmable conveyor belt in machine frame, longitudinal
Preparation for INTEGRALPICKER V
Robot system interface (according to EUROMAP 67), 50-pin
Basic Connectivity for additional "Connected Services"
Printer interface, serial USB
CompactFlash interface for data storage
Dsdpfxoyibayo Aa Seun
Operation authorization with chip card according to EUROMAP 65
Parallel connection for heating band nozzle tip or adapter
Freely configurable page for "start-up parameters"
Color dosing unit interface
Shut-off valve for cooling water inlet
Cooling water filter 100 µm included
3 manual-adjustable free cooling circuits
GOLDEN Automation Package with IP-V
Regulated machine cooling circuits
aXw Control Setup Bundle
aXw Control Start-Stop Bundle
ARBURG Remote Service (ARS)
Productivity package
Initial commissioning by ARBURG service
Instruction and training on the machine at customer's site
CD operating manual and spare parts list
Label language German (DE)
Without granulate container 50 L
Without heating band for nozzle tip
Flexible machine mounting on anti-vibration elements
Connection for ejector plate safety
Quick-release coupling for ejector
Water-cooled control cabinet
Socket distributor: 1 CEE, 1 Schuko
Hydraulic ejector
Safety guard open at the top
Standard equipment packages
Machine equipped with INTEGRALPICKER
New ARBURG color scheme
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다






