HRSG - 폐열 회수 스팀 발생기AUSTRIAN ENERGY
Dual pressure drum boiler
HRSG - 폐열 회수 스팀 발생기
AUSTRIAN ENERGY
Dual pressure drum boiler
제조 연도
1999
상태
중고
위치
Budapest 

사진은 보여줍니다
지도 표시
기계 정보
가격 및 위치
- 위치:
- Budafoki út 52, 1117 Budapest, Magyarország

전화하기
제안 세부 정보
- 광고 ID:
- A21751448
- 업데이트:
- 마지막 업데이트: 20.04.2026
설명
Technical parameters:
• Manufacturer: AUSTRIAN ENERGY
• Type: Dual pressure drum boiler (1999)
• HP steam flow: t/h 40.8
• LP steam flow: t/h 17.3
Lasdpjy D Hy Eefx Anvoa
• HP steam parameters: bar/°C 52 / 425
• LP steam parameters: bar/°C 4.2 / 180
• Flue gas temperature at HRSG outlet: °C 80
• Flue gas stream to the stack: t/h 468, k Nm3/h 482
• Heat recovered by the steam and water cycle from flue gas in HRSG: MWt 45.9
• Maximum output of DH exchanger: MWt 8.0
• Operating hours: 76,000 hours
The high- and low-pressure sections of the equipment and the drums (HP and LP) consist of 6 independent, transportable modules. The boiler wall insulation is partial and requires replacement.
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
• Manufacturer: AUSTRIAN ENERGY
• Type: Dual pressure drum boiler (1999)
• HP steam flow: t/h 40.8
• LP steam flow: t/h 17.3
Lasdpjy D Hy Eefx Anvoa
• HP steam parameters: bar/°C 52 / 425
• LP steam parameters: bar/°C 4.2 / 180
• Flue gas temperature at HRSG outlet: °C 80
• Flue gas stream to the stack: t/h 468, k Nm3/h 482
• Heat recovered by the steam and water cycle from flue gas in HRSG: MWt 45.9
• Maximum output of DH exchanger: MWt 8.0
• Operating hours: 76,000 hours
The high- and low-pressure sections of the equipment and the drums (HP and LP) consist of 6 independent, transportable modules. The boiler wall insulation is partial and requires replacement.
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
공급자
참고: 무료로 등록하거나 로그인하세요, 모든 정보를 확인할 수 있습니다.
최종 온라인: 지난주
등록일: 2026
8 온라인 광고
문의 보내기
전화기 & 팩스
+36 30 82... 광고
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다








