크롬-니켈 파이프 생산 라인BOSSI
크롬-니켈 파이프 생산 라인
BOSSI
EXW VB 부가세 별도
€40,000
제조 연도
2000
상태
중고
위치
Boguchwała 

사진은 보여줍니다
지도 표시
기계 정보
가격 및 위치
EXW VB 부가세 별도
€40,000
- 위치:
- Boguchwała, 폴란드
전화하기
제안 세부 정보
- 광고 ID:
- A20258030
- 업데이트:
- 마지막 업데이트: 10.10.2025
설명
Line for the production of round tubes and closed profiles from black and stainless steel, with diameters ranging from 20.0 mm to 70.0 mm and wall thicknesses from 0.5 mm to 3.5 mm. Different diameter ranges are possible by manufacturing a suitable set of rollers.
The tube or closed profile is formed by rolling the appropriately sized and thick steel strip using a roller set, then joined together by TIG welding. During production, the following processing steps are performed:
a) grinding the weld seam
b) calibration
c) straightening
d) and cutting to length
The finished product, the 'raw tube', can be further processed to achieve the desired surface structure. Two main finishing processes are used:
a) wet grinding using abrasive belts
b) and/or dry polishing using polishing wheels and compounds.
CONSTRUCTION
The tube/profiling line features automatic TIG welding by SAF:
a) Tricathode NERTAMATIC 300 TR TIG inverter, 2 units
b) Tricathode NETRINOX TH 500 TIG inverter, 1 unit
c) Welding of 0.5 – 1.5 mm wall thickness products using E16 torch
d) Welding of 1.5 – 3.5 mm wall thickness products using E25 torch
e) RETRISAF cooling system
1.1 Steel strip coil support and decoiler
1.2 Roll forming stations
a) entry station
b) preliminary forming station
c) main forming station
1.3 Welding segment – triple-electrode TIG welding heads with inert gas (argon) shielding
1.4 Weld seam cleaning station
1.5 Calibration station
1.6 Straightening station
1.7 Flying saw – product cutting to specified length
Additional line components:
1.8 Bossi 4-head tube grinder
Type: CPS 400x3000/4
Belt: 3000x150 mm
1.9 Bossi 2-head tube polisher
Type: CP 400-2U
Isdpfx Aaoxmiiretobc
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
The tube or closed profile is formed by rolling the appropriately sized and thick steel strip using a roller set, then joined together by TIG welding. During production, the following processing steps are performed:
a) grinding the weld seam
b) calibration
c) straightening
d) and cutting to length
The finished product, the 'raw tube', can be further processed to achieve the desired surface structure. Two main finishing processes are used:
a) wet grinding using abrasive belts
b) and/or dry polishing using polishing wheels and compounds.
CONSTRUCTION
The tube/profiling line features automatic TIG welding by SAF:
a) Tricathode NERTAMATIC 300 TR TIG inverter, 2 units
b) Tricathode NETRINOX TH 500 TIG inverter, 1 unit
c) Welding of 0.5 – 1.5 mm wall thickness products using E16 torch
d) Welding of 1.5 – 3.5 mm wall thickness products using E25 torch
e) RETRISAF cooling system
1.1 Steel strip coil support and decoiler
1.2 Roll forming stations
a) entry station
b) preliminary forming station
c) main forming station
1.3 Welding segment – triple-electrode TIG welding heads with inert gas (argon) shielding
1.4 Weld seam cleaning station
1.5 Calibration station
1.6 Straightening station
1.7 Flying saw – product cutting to specified length
Additional line components:
1.8 Bossi 4-head tube grinder
Type: CPS 400x3000/4
Belt: 3000x150 mm
1.9 Bossi 2-head tube polisher
Type: CP 400-2U
Isdpfx Aaoxmiiretobc
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다