세척용액용 온도조절 스키드 BrinoxBRINOX
LEP 13.1
세척용액용 온도조절 스키드 Brinox
BRINOX
LEP 13.1
제조 연도
2020
상태
신규
위치
Solingen 

사진은 보여줍니다
지도 표시
기계 정보
가격 및 위치
- 위치:
- Landwehrstraße 55-65, 42699 Solingen, Deutschland

전화하기
기술 세부 사항
- 장비:
- 문서 / 매뉴얼
제안 세부 정보
- 광고 ID:
- A21293747
- 참조 번호:
- Paket 10 KK6770
- 업데이트:
- 마지막 업데이트: 21.02.2026
설명
Manufacturer: BRINOX
Product: LEP13.1 – AS-Batch Temperature Control Unit
System type: Temperature control unit for ammonium sulfate batch system
Year of manufacture: 2020
Serial number: 1003620
Tag number: MR-ASF-ASF61-KK6770
Equipment number: 20022748
Media Connections / Process Data
WCOV – Chilled water supply: 6 °C
WCOR – Chilled water return: 12 °C
WSV – Process/municipal water
AIP10 – Control compressed air 6 bar
Design as a closed temperature control module with integrated pump and heat exchanger technology.
Dimensions
Overall dimensions as per layout:
approx. 1920 x 1435 x 1573 mm (L x W x H)
Compact, skid-mounted unit with welded stainless steel frame.
Construction
Frame construction in stainless steel
Fully insulated piping (industrial insulation)
Stainless steel shell-and-tube heat exchanger
Electrical inline water heater WT1011
Pump PU1021
Pump PU9203
Heat exchanger WT1001
Expansion vessel BH9701
Fittings:
GEMÜ shut-off valves
Pneumatically actuated valves
Manual ball valves
Pressure gauges
Sensors and instrumentation as per P&ID
Complete piping and component labeling provided.
Condition
New and in original packaging.
Not yet put into operation in production.
Factory new condition.
Supplied directly by the manufacturer Brinox.
FAT / Test Status
FAT carried out.
Leak test:
Test medium: Compressed air
Test pressure: approx. 3 bar
Holding time: 1 hour
Result: Passed
Calibration:
Pressure gauge calibrated
Measuring range: 0–10 bar
Calibration certificate available
Traceable to national standards
Documentation
Turn-Over-Package complete
Included documents:
FAT plan
FAT report
Non-conformance form
Layout drawing check
Maintenance and calibration accessibility check
P&ID review
Leak test report
Calibration certificates
Documentation check
Factory certificate 2.1 according to EN 10204
LBM material list incl. EU declarations
List of installed components – equipment
List of installed components – instrumentation points (PLT)
Material parts list for as-built isometry
Key Features
GMP-compliant construction
Pharma/biotech project quality
Kodpfxeyl Izxj Advjdh
Full traceability
Compact plug-and-play skid design
Completely piped, insulated, and ready to connect
Immediately available
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
Product: LEP13.1 – AS-Batch Temperature Control Unit
System type: Temperature control unit for ammonium sulfate batch system
Year of manufacture: 2020
Serial number: 1003620
Tag number: MR-ASF-ASF61-KK6770
Equipment number: 20022748
Media Connections / Process Data
WCOV – Chilled water supply: 6 °C
WCOR – Chilled water return: 12 °C
WSV – Process/municipal water
AIP10 – Control compressed air 6 bar
Design as a closed temperature control module with integrated pump and heat exchanger technology.
Dimensions
Overall dimensions as per layout:
approx. 1920 x 1435 x 1573 mm (L x W x H)
Compact, skid-mounted unit with welded stainless steel frame.
Construction
Frame construction in stainless steel
Fully insulated piping (industrial insulation)
Stainless steel shell-and-tube heat exchanger
Electrical inline water heater WT1011
Pump PU1021
Pump PU9203
Heat exchanger WT1001
Expansion vessel BH9701
Fittings:
GEMÜ shut-off valves
Pneumatically actuated valves
Manual ball valves
Pressure gauges
Sensors and instrumentation as per P&ID
Complete piping and component labeling provided.
Condition
New and in original packaging.
Not yet put into operation in production.
Factory new condition.
Supplied directly by the manufacturer Brinox.
FAT / Test Status
FAT carried out.
Leak test:
Test medium: Compressed air
Test pressure: approx. 3 bar
Holding time: 1 hour
Result: Passed
Calibration:
Pressure gauge calibrated
Measuring range: 0–10 bar
Calibration certificate available
Traceable to national standards
Documentation
Turn-Over-Package complete
Included documents:
FAT plan
FAT report
Non-conformance form
Layout drawing check
Maintenance and calibration accessibility check
P&ID review
Leak test report
Calibration certificates
Documentation check
Factory certificate 2.1 according to EN 10204
LBM material list incl. EU declarations
List of installed components – equipment
List of installed components – instrumentation points (PLT)
Material parts list for as-built isometry
Key Features
GMP-compliant construction
Pharma/biotech project quality
Kodpfxeyl Izxj Advjdh
Full traceability
Compact plug-and-play skid design
Completely piped, insulated, and ready to connect
Immediately available
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다




























