가이드식 추진 기계를 알고 있음FIJALO-POLAND
ALUSTEER
가이드식 추진 기계를 알고 있음
FIJALO-POLAND
ALUSTEER
VB 부가세 별도
€20,000
제조 연도
2025
상태
신규
(완전히 작동합니다)
위치
Gdańsk 

기본 정보
가격 및 위치
VB 부가세 별도
€20,000
- 위치:
- Gdańsk, 폴란드

전화하기
기술 세부 사항
치수 및 중량
총중량:
105 kg
제안 세부 정보
- 광고 ID:
- A20552370
- 업데이트:
- 마지막 업데이트: 06.03.2026
설명
What is controlled jacking?
Controlled jacking is a trenchless technology that allows underground installations—such as water pipes, sewage pipes, power cables, electrical cables, telecommunications cables, fiber optic cables, water pipes, and sewage pipes—to be laid without the need for extensive excavation. The jacking machine is hydraulically driven and equipped with a pilot head that can be used to correct the path of the jacking.
Thanks to measuring systems, the operator controls the depth and direction of the jacking, which allows for high precision, even with passages several dozen meters long, in situations where accuracy and precise avoidance of obstacles in the terrain are important in order not to damage the existing infrastructure and to safely bypass it.
This solution is particularly valued in places where earthworks are difficult or impossible, e.g., under roads, lawns, tram tracks, parking lots, sidewalks, or urban areas.
Why use controlled pipe jacking?
Controlled pipe jacking is an alternative to traditional excavation, eliminating the need to dig up the surface. This method significantly reduces the time needed to complete the project, lowers the cost of restoring the site to its original condition, and minimizes the impact on traffic and the environment.
The most important advantages of controlled pipe jacking technology:
- no need to interfere with above-ground infrastructure,
- the ability to work under obstacles (e.g., roads, sidewalks, lawns, property entrances, railroad tracks),
- reduction of noise,
- vibrations, and environmental pollution,
- high route accuracy,
Itsdpfexxhzwox Aitep
- quick mobilization of equipment and short completion time,
- lower risk of collision with existing installations.
- no need to use bentonite slurry,
- no spoil during jacking
Thanks to these features, controlled jacking is commonly used in the construction of municipal networks, water and sewage connections, gas, fiber optic and cable connections.
Application of controlled jacking
Controlled jacking is ideal wherever installation is required without disrupting the surrounding area.
The most common applications for jacking machines are:
- crossings under roads and streets with heavy traffic,
- jacking under railway and tram tracks,
- crossings under watercourses and canals,
-installations under sidewalks, parking lots, squares, and industrial areas,
- connections to properties without digging up the entire area.
With the ALUSTEER product, no drilling mud (bentonite) is used, which significantly reduces implementation costs and environmental impact.
This technology can be used both in cities and in non-urban areas – wherever precision, speed, and reduced impact are important.
Accuracy and direction control
Modern jacking machines use sensors that enable continuous monitoring of the head position. The operator tracks the parameters on the receiver and operator tablet and reacts in case of deviations from the planned route.
Such solutions ensure:
- high precision of the breakthrough,
- safety for the existing infrastructure,
- repeatability and predictability of results.
In practice, deviations from the jacking axis are usually no more than a few centimeters, which is fully acceptable in most projects.
Controlled jacking is a trenchless technology that allows underground installations—such as water pipes, sewage pipes, power cables, electrical cables, telecommunications cables, fiber optic cables, water pipes, and sewage pipes—to be laid without the need for extensive excavation. The jacking machine is hydraulically driven and equipped with a pilot head that can be used to correct the path of the jacking.
Thanks to measuring systems, the operator controls the depth and direction of the jacking, which allows for high precision, even with passages several dozen meters long, in situations where accuracy and precise avoidance of obstacles in the terrain are important in order not to damage the existing infrastructure and to safely bypass it.
This solution is particularly valued in places where earthworks are difficult or impossible, e.g., under roads, lawns, tram tracks, parking lots, sidewalks, or urban areas.
Why use controlled pipe jacking?
Controlled pipe jacking is an alternative to traditional excavation, eliminating the need to dig up the surface. This method significantly reduces the time needed to complete the project, lowers the cost of restoring the site to its original condition, and minimizes the impact on traffic and the environment.
The most important advantages of controlled pipe jacking technology:
- no need to interfere with above-ground infrastructure,
- the ability to work under obstacles (e.g., roads, sidewalks, lawns, property entrances, railroad tracks),
- reduction of noise,
- vibrations, and environmental pollution,
- high route accuracy,
Itsdpfexxhzwox Aitep
- quick mobilization of equipment and short completion time,
- lower risk of collision with existing installations.
- no need to use bentonite slurry,
- no spoil during jacking
Thanks to these features, controlled jacking is commonly used in the construction of municipal networks, water and sewage connections, gas, fiber optic and cable connections.
Application of controlled jacking
Controlled jacking is ideal wherever installation is required without disrupting the surrounding area.
The most common applications for jacking machines are:
- crossings under roads and streets with heavy traffic,
- jacking under railway and tram tracks,
- crossings under watercourses and canals,
-installations under sidewalks, parking lots, squares, and industrial areas,
- connections to properties without digging up the entire area.
With the ALUSTEER product, no drilling mud (bentonite) is used, which significantly reduces implementation costs and environmental impact.
This technology can be used both in cities and in non-urban areas – wherever precision, speed, and reduced impact are important.
Accuracy and direction control
Modern jacking machines use sensors that enable continuous monitoring of the head position. The operator tracks the parameters on the receiver and operator tablet and reacts in case of deviations from the planned route.
Such solutions ensure:
- high precision of the breakthrough,
- safety for the existing infrastructure,
- repeatability and predictability of results.
In practice, deviations from the jacking axis are usually no more than a few centimeters, which is fully acceptable in most projects.
공급자
참고: 무료로 등록하거나 로그인하세요, 모든 정보를 확인할 수 있습니다.
등록일: 2025
1 온라인 광고
문의 보내기
전화기 & 팩스
+48 534 9... 광고
이 광고들도 당신에게 관심이 있을 수 있습니다.
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Gilze
8,823 km
볼보 FH16 650 8x4 / 115 tm 크레인 / 트랙터
VolvoFH16 650 8x4 / 115 tm CRANE / KRAN / TRACTOR
VolvoFH16 650 8x4 / 115 tm CRANE / KRAN / TRACTOR
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Österreich
8,624 km
Doublebeltpress
KreuzmayrK2B 1250
KreuzmayrK2B 1250
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Crailsheim
8,753 km
텔레핸들러
ManitouMT 730H
ManitouMT 730H
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Most Na Soci
8,769 km
테이블 샷 블라스트 머신 DB 1200x500
Siapro d.o.o.DB 1250x500, 1x7.5kW
Siapro d.o.o.DB 1250x500, 1x7.5kW
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Oberaschau
8,663 km
이동식 크레인
TerexAC 40-1 City
TerexAC 40-1 City
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Hedel
8,793 km
Jekko SPX 650 CL2 플라이 지브, 윈치, 완전 전동식!! DK1305
JekkoSPX 650 CL2 Fly-jib, Lier, VOL ELECTRISCH!!
JekkoSPX 650 CL2 Fly-jib, Lier, VOL ELECTRISCH!!
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Gilze
8,823 km
볼보 FH16 650 8x4 / 115 tm 크레인 / 트랙터
VolvoFH16 650 8x4 / 115 tm CRANE / KRAN / TRACTOR
VolvoFH16 650 8x4 / 115 tm CRANE / KRAN / TRACTOR
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Bovenden
8,573 km
농업 기계
verschiedene Reifen 17,5 bis 24 Zoll, ca. 1.000
verschiedene Reifen 17,5 bis 24 Zoll, ca. 1.000
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Heteren
8,753 km
볼보 FH 500 FH 500 8x4 HMF 5020-K6 + FJ 1000-K5
VolvoFH 500 FH 500 8x4 HMF 5020-K6 + FJ 1000-K5
VolvoFH 500 FH 500 8x4 HMF 5020-K6 + FJ 1000-K5
성공
귀하의 메시지가 전송되었습니다.
소형 광고
Veghel
8,791 km
크레인
BKRS Portaalkraan Gantry CraneDPL-21-50
BKRS Portaalkraan Gantry CraneDPL-21-50
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다












































































































































































