PaperSpike 2 GGrumbach und Petermann GmbH
PaperSpike 2G 2500
PaperSpike 2 G
Grumbach und Petermann GmbH
PaperSpike 2G 2500
상태
중고
위치
네덜란드 

사진은 보여줍니다
지도 표시
기계 정보
가격 및 위치
- 위치:
- , 네덜란드
전화하기
제안 세부 정보
- 광고 ID:
- A17766311
- 업데이트:
- 마지막 업데이트: 20.11.2024
설명
Technical data PaperSpike 2 G:
Manufacturer Grumbach und Petermann GmbH
Type 2500
Year of construction 2019
Dimensions accelerator belt 3,000 x 2,980 x 600 mm (l x w x h)
Weight 1,100 kg
Dimensions PaperSpike sorting unit 2,480 x 2,982 x 1,805 mm (l x w x h)
Weight 3,100 kg
Dimensions PaperSpike 2G complete 5,450 x 3,480 x 1,805 mm (l x w x h)
Weight 4,600 kg
Dimensions paper discharge conveyor 3,400 x 1,200 x 650 mm (l x w x h)
Weight 400 kg
Electrical equipment of the entire system:
Voltage 380 - 420 V
Connected load 9.5 kW
Current consumption 20.34 A
Operating principle:
The material is fed in as dry and thin a layer as possible, preferably a monolayer, evenly over the entire width on the accelerator belt.
The sorting roller with the spikes pulls the mixed paper from the chute, while cardboard boxes are impaled and held by the spikes. Material (paper) with low stiffness (newspapers, magazines, brochures, etc.) is not held by the spikes and falls into a paper bunker or onto a discharge conveyor after the chute. The spiked
cardboard boxes are knocked off the sorting roller by the knock-off shaft and then fall onto the cardboard removal belt or into a separate bunker.
Throughput capacity:
Depending on pre-sorting, the nature of the feed material and machine settings, between 10 and 12 tonnes per line, per hour can be processed.
Gkedpfx Aaju Tg Sijtec
Scope of delivery:
2 pieces PaperSpike 2G incl. 2 geared motors
2 pieces accelerator belt incl. gear motor
2 pieces paper discharge belt incl. gear motor (The cardboard discharge belt is not for sale and is therefore not included in the delivery!
There are two lines available for sale. Depending on the customer's request, either one unit or both units together are sold. The sales price always applies to one unit.
Comments:
The plants are expected to be dismantled by the end of October and will then be ready for loading. The documentation (Manual, CE-declaration, electr./hydr.-drawings), are completely available. Inspections are possible after agreement. We will not assume liability for the given technical data and possible errors.
Manufacturer Grumbach und Petermann GmbH
Type 2500
Year of construction 2019
Dimensions accelerator belt 3,000 x 2,980 x 600 mm (l x w x h)
Weight 1,100 kg
Dimensions PaperSpike sorting unit 2,480 x 2,982 x 1,805 mm (l x w x h)
Weight 3,100 kg
Dimensions PaperSpike 2G complete 5,450 x 3,480 x 1,805 mm (l x w x h)
Weight 4,600 kg
Dimensions paper discharge conveyor 3,400 x 1,200 x 650 mm (l x w x h)
Weight 400 kg
Electrical equipment of the entire system:
Voltage 380 - 420 V
Connected load 9.5 kW
Current consumption 20.34 A
Operating principle:
The material is fed in as dry and thin a layer as possible, preferably a monolayer, evenly over the entire width on the accelerator belt.
The sorting roller with the spikes pulls the mixed paper from the chute, while cardboard boxes are impaled and held by the spikes. Material (paper) with low stiffness (newspapers, magazines, brochures, etc.) is not held by the spikes and falls into a paper bunker or onto a discharge conveyor after the chute. The spiked
cardboard boxes are knocked off the sorting roller by the knock-off shaft and then fall onto the cardboard removal belt or into a separate bunker.
Throughput capacity:
Depending on pre-sorting, the nature of the feed material and machine settings, between 10 and 12 tonnes per line, per hour can be processed.
Gkedpfx Aaju Tg Sijtec
Scope of delivery:
2 pieces PaperSpike 2G incl. 2 geared motors
2 pieces accelerator belt incl. gear motor
2 pieces paper discharge belt incl. gear motor (The cardboard discharge belt is not for sale and is therefore not included in the delivery!
There are two lines available for sale. Depending on the customer's request, either one unit or both units together are sold. The sales price always applies to one unit.
Comments:
The plants are expected to be dismantled by the end of October and will then be ready for loading. The documentation (Manual, CE-declaration, electr./hydr.-drawings), are completely available. Inspections are possible after agreement. We will not assume liability for the given technical data and possible errors.
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다