크롤러 굴착기Hidromek
HMK 140 LC
크롤러 굴착기
Hidromek
HMK 140 LC
제조 연도
2024
상태
신규
위치
Hamburg 

사진은 보여줍니다
지도 표시
기계 정보
가격 및 위치
- 판매자 위치:
- Finkenriek 29, 21109 Hamburg, 독일

전화하기
제안 세부 정보
- 광고 ID:
- A18387501
- 업데이트:
- 마지막 업데이트: 10.07.2025
설명
Price 125900 + VAT Long-term lease possible From one year up to 4 years possible
HMK 140LC-5, 2.30 M ARM 4.8 M BOOM / 0.7 M3 - 1,200 MM BUCKET
Fuel supply pump
Single-/double-acting hydraulic line
Auxiliary hydraulic line for rotary movement
Dual High Flow - double-acting High Flow hydraulic line.
Setting the flow rate (liters per minute) on the display
?Pressure setting (bar) available on the panel for HMK145 LCSR, but not yet for HMK 140 LC. We hope this will be available by the time the machine goes into production.?
Hydraulic line for quick coupler
Proportional control on the joystick
Safety valves for boom and arm
Boom cylinder pipe protection
Overload warning switch
Rod guard
Pneumatic seat with seat heating
Rain/sun visor
Beacon light
FOPS2 cab protection system
Complete windshield protection cage (stone/rock)
Mono boom 4.6 m
2-piece boom 4.6 m
Front dozer blade
Rear view camera
Cameras right
Bucket: D.R., 0.6 m3 - 985 mm ==> 0.7 m3 - 1145 mm
Without bucket: D.R., 0.6 m3 - 985 mm ==> 0.7 m3 - 1145 mm
2.6 m stick price difference (standard 2.3 m)
500 mm track shoes + 4 additional holes for bolting option
600 mm
700 mm
Travel alarm
LED work lights
Automatic lubrication system Groeneveld Twin Heavy Duty
"Remote Hidromek check-up diagnosis box,
=+1 year extended warranty "
Warranty 1 year or 2,000 hours, whichever comes first.
CE certificate
Subject to prior sale and errors. Pictures show original consumption data
Ljdpfx Aevvfvqsatehn
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
HMK 140LC-5, 2.30 M ARM 4.8 M BOOM / 0.7 M3 - 1,200 MM BUCKET
Fuel supply pump
Single-/double-acting hydraulic line
Auxiliary hydraulic line for rotary movement
Dual High Flow - double-acting High Flow hydraulic line.
Setting the flow rate (liters per minute) on the display
?Pressure setting (bar) available on the panel for HMK145 LCSR, but not yet for HMK 140 LC. We hope this will be available by the time the machine goes into production.?
Hydraulic line for quick coupler
Proportional control on the joystick
Safety valves for boom and arm
Boom cylinder pipe protection
Overload warning switch
Rod guard
Pneumatic seat with seat heating
Rain/sun visor
Beacon light
FOPS2 cab protection system
Complete windshield protection cage (stone/rock)
Mono boom 4.6 m
2-piece boom 4.6 m
Front dozer blade
Rear view camera
Cameras right
Bucket: D.R., 0.6 m3 - 985 mm ==> 0.7 m3 - 1145 mm
Without bucket: D.R., 0.6 m3 - 985 mm ==> 0.7 m3 - 1145 mm
2.6 m stick price difference (standard 2.3 m)
500 mm track shoes + 4 additional holes for bolting option
600 mm
700 mm
Travel alarm
LED work lights
Automatic lubrication system Groeneveld Twin Heavy Duty
"Remote Hidromek check-up diagnosis box,
=+1 year extended warranty "
Warranty 1 year or 2,000 hours, whichever comes first.
CE certificate
Subject to prior sale and errors. Pictures show original consumption data
Ljdpfx Aevvfvqsatehn
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다


















