분말용 장비Malarnia proszkowa Mogielnicki
분말용 장비
Malarnia proszkowa Mogielnicki
EXW 고정 가격 부가세 별도
€119,000
제조 연도
2017
상태
중고
위치
Dołuje 

사진은 보여줍니다
지도 표시
기계 정보
가격 및 위치
EXW 고정 가격 부가세 별도
€119,000
- 위치:
- 72-002 Dołuje, Polska

전화하기
기술 세부 사항
- 장비:
- 캐빈
제안 세부 정보
- 광고 ID:
- A20614390
- 업데이트:
- 마지막 업데이트: 26.11.2025
설명
For sale: a complete, fully operational Mogielnicki automatic powder coating line.
The equipment was manufactured in 2017 and is in excellent technical condition, having run for only 8,073 hours. The line comes with complete technical documentation and is ready for immediate commissioning.
Equipment details:
- 5-stage spray washer (washing, rinsing, passivation, drying)
Nedpsxzdi Ajfx Aaqewp
– 8 spray gates, 112 nozzles
– pumps: 101 m³/h, power: 9.2 kW
– tank: 3 m³, Riello heating, temperature: 50–60°C
– AISI 304 stainless steel
- Tunnel dryer with automatic temperature control
- Cyclone powder coating booth with platforms
– 4 Gema automatic spray guns
– 2 Gema manual spray guns
– Booth equipped with cyclone and powder paint recovery system, ensuring high process efficiency and reduced material losses
- Powder paint polymerisation oven
- Overhead conveyor system – speed: 1 m/min, max. 50 kg/m
- Dual-stage demineralisation station
Technical parameters:
- Maximum workpiece size: 1200 × 500 × 1200 mm (in practice, items up to approx. 1900 mm in length can be coated)
- Required floor space: 25.5 × 15 × 5 m
- Conveyor speed: 1 m/min
- Installed power: 99 kW
Media requirements:
- Heating oil: 77 l/h (start-up), 47 l/h (continuous operation)
- Mains water: 200 l/h
- Compressed air: 58 m³/h (6 bar)
Condition:
The line was used in serial production, regularly serviced, and maintained in excellent condition. Fully automatic control – temperature regulators, safety sensors, Riello heating.
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
The equipment was manufactured in 2017 and is in excellent technical condition, having run for only 8,073 hours. The line comes with complete technical documentation and is ready for immediate commissioning.
Equipment details:
- 5-stage spray washer (washing, rinsing, passivation, drying)
Nedpsxzdi Ajfx Aaqewp
– 8 spray gates, 112 nozzles
– pumps: 101 m³/h, power: 9.2 kW
– tank: 3 m³, Riello heating, temperature: 50–60°C
– AISI 304 stainless steel
- Tunnel dryer with automatic temperature control
- Cyclone powder coating booth with platforms
– 4 Gema automatic spray guns
– 2 Gema manual spray guns
– Booth equipped with cyclone and powder paint recovery system, ensuring high process efficiency and reduced material losses
- Powder paint polymerisation oven
- Overhead conveyor system – speed: 1 m/min, max. 50 kg/m
- Dual-stage demineralisation station
Technical parameters:
- Maximum workpiece size: 1200 × 500 × 1200 mm (in practice, items up to approx. 1900 mm in length can be coated)
- Required floor space: 25.5 × 15 × 5 m
- Conveyor speed: 1 m/min
- Installed power: 99 kW
Media requirements:
- Heating oil: 77 l/h (start-up), 47 l/h (continuous operation)
- Mains water: 200 l/h
- Compressed air: 58 m³/h (6 bar)
Condition:
The line was used in serial production, regularly serviced, and maintained in excellent condition. Fully automatic control – temperature regulators, safety sensors, Riello heating.
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다
























