정확한 제어가 가능한 혼합 플랜트Mischanlage elktronisch gesteuert
정확한 제어가 가능한 혼합 플랜트
Mischanlage elktronisch gesteuert
VB 부가세 별도
€38,500
제조 연도
2023
상태
중고
위치
Havelsee 

기계 정보
가격 및 위치
VB 부가세 별도
€38,500
- 위치:
- Havelsee, 독일

전화하기
기술 세부 사항
- 공급 트레이 수:
- 2
제안 세부 정보
- 광고 ID:
- A22368807
- 업데이트:
- 마지막 업데이트: 21.07.2026
설명
Scope of supply of the system
The offer includes:
1. Mixer
• Concrete mixer with a capacity of 9 m³.
• Mixer screw inside the mixer has been renewed and reinforced.
Klsdezmyvispfx Aqrjw
• The mixer is driven by a powerful electric motor.
• The mixer is mounted on four load cells (each with a load capacity of 20 t) for precise weighing of the materials to be mixed.
2. Trough screw conveyor 1
• Conveying system for feeding the mixer.
3. Trough screw conveyor 2
• Conveying system for discharging the finished mixed material.
4. Liquid feed
• Dosing of liquid components via a pumping system from Flux.
5. Electronic control
• Electronic control with a mobile operating unit for weighing and dosing based on the weight increase of the material in the mixer.
Mode of operation
• The mixer is installed on load cells. The current material weight is displayed on the display at all times.
• For example, if a total mixture of 4,500 kg is to be produced, this can be dosed precisely according to a predefined mixing ratio, e.g. 80% main material (3,600 kg), 10% additive (450 kg), 7% additive (315 kg) and 3% additive (135 kg).
• The smaller additives are pre-weighed and fed into trough screw conveyor 1 via the additive hopper using a travelling carriage from big bags.
• Subsequently, the main material is conveyed into the mixer via trough screw conveyor 1 until the desired total weight of 4,500 kg is reached.
• After that, the feed is stopped via the trough screw conveyor.
• The mixing process then takes place according to the requirements. In our application, the mixing time was approximately 20 minutes.
• After the mixing process is complete, the material is discharged via trough screw conveyor 2. To do this, the direction of rotation of the drive motor is switched at the control panel and the discharge screw conveyor is switched on.
• The finished mixture can then be filled directly into containers or loaded into transport vehicles (in our case, a push-off trailer or manure spreader).
Mixing process based on weight percentages
1. The main material is fed into the trough screw conveyor via the large stainless steel hopper, which then conveys the material into the mixer. In our case, this consisted of solid components from biogas waste.
2. Additional components can be added directly from big bags onto the main material using a second stainless steel hopper and a traverse. This ensures pre-mixing during the conveying process. In our application, biochar and bentonite were added.
3. Liquid components are sprayed directly into the mixer. In our case, we used EMa (activated effective microorganisms) for this purpose.
Optionally, the push-off trailer/manure spreader can be purchased.
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
The offer includes:
1. Mixer
• Concrete mixer with a capacity of 9 m³.
• Mixer screw inside the mixer has been renewed and reinforced.
Klsdezmyvispfx Aqrjw
• The mixer is driven by a powerful electric motor.
• The mixer is mounted on four load cells (each with a load capacity of 20 t) for precise weighing of the materials to be mixed.
2. Trough screw conveyor 1
• Conveying system for feeding the mixer.
3. Trough screw conveyor 2
• Conveying system for discharging the finished mixed material.
4. Liquid feed
• Dosing of liquid components via a pumping system from Flux.
5. Electronic control
• Electronic control with a mobile operating unit for weighing and dosing based on the weight increase of the material in the mixer.
Mode of operation
• The mixer is installed on load cells. The current material weight is displayed on the display at all times.
• For example, if a total mixture of 4,500 kg is to be produced, this can be dosed precisely according to a predefined mixing ratio, e.g. 80% main material (3,600 kg), 10% additive (450 kg), 7% additive (315 kg) and 3% additive (135 kg).
• The smaller additives are pre-weighed and fed into trough screw conveyor 1 via the additive hopper using a travelling carriage from big bags.
• Subsequently, the main material is conveyed into the mixer via trough screw conveyor 1 until the desired total weight of 4,500 kg is reached.
• After that, the feed is stopped via the trough screw conveyor.
• The mixing process then takes place according to the requirements. In our application, the mixing time was approximately 20 minutes.
• After the mixing process is complete, the material is discharged via trough screw conveyor 2. To do this, the direction of rotation of the drive motor is switched at the control panel and the discharge screw conveyor is switched on.
• The finished mixture can then be filled directly into containers or loaded into transport vehicles (in our case, a push-off trailer or manure spreader).
Mixing process based on weight percentages
1. The main material is fed into the trough screw conveyor via the large stainless steel hopper, which then conveys the material into the mixer. In our case, this consisted of solid components from biogas waste.
2. Additional components can be added directly from big bags onto the main material using a second stainless steel hopper and a traverse. This ensures pre-mixing during the conveying process. In our application, biochar and bentonite were added.
3. Liquid components are sprayed directly into the mixer. In our case, we used EMa (activated effective microorganisms) for this purpose.
Optionally, the push-off trailer/manure spreader can be purchased.
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
공급자
참고: 무료로 등록하거나 로그인하세요, 모든 정보를 확인할 수 있습니다.
등록일: 2021
1 온라인 광고
문의 보내기
전화기 & 팩스
+49 8191 ... 광고
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다




















