페인트 가게Pony Luxury Coating
Pony L11000 (11x5x5)
페인트 가게
Pony Luxury Coating
Pony L11000 (11x5x5)
제조 연도
2025
상태
신규
위치
Würzburg 

사진은 보여줍니다
지도 표시
기계 정보
가격 및 위치
- 위치:
- Schulstr 3, 97084 Würzburg, Deutschland

전화하기
기술 세부 사항
- 총 높이:
- 5,600 mm
- 총 길이:
- 11,200 mm
- 총 폭:
- 5,100 mm
- 입력 전류 유형:
- 삼상
- 보증 기간:
- 24 개월
- 내부 높이:
- 4,970 mm
- 내부 길이:
- 11,000 mm
- 온도:
- 80 °C
- 내부 폭:
- 5,000 mm
- 공기 수요:
- 52,000 ㎥/h
- 입력 전압:
- 380 V
- 난방 용량:
- 250 킬로와트 (339.91 마력)
- 동력:
- 45 킬로와트 (61.18 마력)
- 연료:
- 액화 석유 가스 (LPG)
- 입력 주파수:
- 50 헤르츠
- 에너지 소비:
- 45 킬로와트시
- 단열 두께:
- 50 mm
- 정격 출력:
- 250 킬로와트 (339.91 마력)
- 강판 두께 (최대):
- 2 mm
- 장비:
- 조명
제안 세부 정보
- 광고 ID:
- A19572531
- 업데이트:
- 마지막 업데이트: 07.10.2025
설명
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
Ltsdewzl Hxjpfx Ad Hja
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
Ltsdewzl Hxjpfx Ad Hja
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
이 광고들도 당신에게 관심이 있을 수 있습니다.
소형 광고
Velen
8,701 km
수공구
HBMKrimpzange Akku
HBMKrimpzange Akku
소형 광고
Wielka Nieszawka
8,026 km
갠트리 크레인 5T - 신규
WNM Sp. Z O.O.
WNM Sp. Z O.O.
소형 광고
Luckenwalde
8,372 km
단계별 습식 도장 시스템
PROTONSTP-STP
PROTONSTP-STP
소형 광고
Büyükkayacık OSB
8,053 km
로우 로더
GVN Trailer3 Axle Hydraulic Platform Lowbed
GVN Trailer3 Axle Hydraulic Platform Lowbed
소형 광고
Nettetal
8,781 km
파우더 오븐
KM IndustrieserviceElektro Kammerofen KM Pro
KM IndustrieserviceElektro Kammerofen KM Pro
소형 광고
Parma
9,065 km
로우로더 건설기계
CEYLAN carrellone rampe idrauliche nuovo
CEYLAN carrellone rampe idrauliche nuovo
소형 광고
Malax
7,255 km
Giardini GST UV 건조 터널
GiardinaGST 1401/3+2
GiardinaGST 1401/3+2
소형 광고
Büyükkayacık OSB
8,053 km
로우 로더
GVN Trailer3 Axle Tramex Platform Lowbed
GVN Trailer3 Axle Tramex Platform Lowbed
소형 광고
이탈리아
9,200 km
페인트 마감 시스템
HAS KİM İNŞAAT VE MAKİNE KİMYEVİ MADDE SPowder Coating Plant - Automatic
HAS KİM İNŞAAT VE MAKİNE KİMYEVİ MADDE SPowder Coating Plant - Automatic
소형 광고
Calden
8,616 km
에너지 저장
ProtonProton Energiespeicher EC-100&230
ProtonProton Energiespeicher EC-100&230
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다















































































