밀가루 사일로Daxner/AT
밀가루 사일로
Daxner/AT
VB 부가세 별도
€8,900
상태
중고
위치
Ingolstadt 

사진은 보여줍니다
지도 표시
가격 및 위치
VB 부가세 별도
€8,900
- 위치:
- Lessingstraße 61, Bäckerei Kuttenreich, 85055 Ingolstadt, DE

전화하기
제안 세부 정보
- 광고 ID:
- A18548811
- 업데이트:
- 마지막 업데이트: 19.09.2025
설명
The silo system works based on negative pressure and works without any problems. (no transport spindles)
The flour is currently conveyed over a length of 30 meters and 2 bends (90 degrees).
The filling quantity is regulated by the actual weight in the weighing hopper.
The flour silo consists roughly of the following components:
+Control (Siemens/Daxner)
-with 5-fold component weighing
-Recipe storage
+Water conveying with temperature control
Djdpsv Accnjfx Ad Uskw
+3 aluminum silos (ATS)
-Capacity approx. 5 t each
-Modular design to adapt to room height
-with aluminum feet
-Automatic loosening
The silo tanks are easy to clean (no corners)
The silo tanks can be dismantled into individual parts, so removal is absolutely problem-free.
+ Scale/filling hopper (emptying)
+ Flour sieving system is integrated into the weighing hopper. + Water tank is located on the weighing hopper
The silo can be dismantled from week 11
The silo is fully functional and can be inspected in operation.
No guarantee or warranty
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
The flour is currently conveyed over a length of 30 meters and 2 bends (90 degrees).
The filling quantity is regulated by the actual weight in the weighing hopper.
The flour silo consists roughly of the following components:
+Control (Siemens/Daxner)
-with 5-fold component weighing
-Recipe storage
+Water conveying with temperature control
Djdpsv Accnjfx Ad Uskw
+3 aluminum silos (ATS)
-Capacity approx. 5 t each
-Modular design to adapt to room height
-with aluminum feet
-Automatic loosening
The silo tanks are easy to clean (no corners)
The silo tanks can be dismantled into individual parts, so removal is absolutely problem-free.
+ Scale/filling hopper (emptying)
+ Flour sieving system is integrated into the weighing hopper. + Water tank is located on the weighing hopper
The silo can be dismantled from week 11
The silo is fully functional and can be inspected in operation.
No guarantee or warranty
이 광고는 자동으로 번역되었습니다. 번역 오류가 있을 수 있습니다.
귀하의 광고가 성공적으로 삭제되었습니다
오류가 발생했습니다














